Science & Technology: Research & Development Laboratories

Project Sparta
60,000 SF

   ■  Hyper-tracked, multi-campus construction and relocation of life sciences, laboratory administrative space, and site improvements on accelerated schedule
   ■  Program defined and aligned key business-driven workflow adjacencies, taking one campus and redistributing the functions across two
   ■  Defined, aligned, and executed enabling moves in a critical, strategic logic
   ■  Innovative solutions serve to create environments that allow for the flexibility of their undefined future


R&D Innovation Center
10,000 SF

   ■  Design and construction of a relocated call center, including a new UPS back up system and confidentiality requirements
   ■  New spaces and relocated areas from another campus, including 3D model shop, testing and electronics workroom, and research and development workrooms
   ■  Conceptual options for enhancing collaboration in other areas of the building, such as Innovation Cafe, multiple "think tanks", and teaming areas



Pilot Plant
7,000 SF

   ■  Studied locations and presented options for Campus Master Plan project
   ■  Drug production pilot plant to supply preclinical and development studies
   ■  Suite includes upstream and downstream production processes, MTS, and support functions
   ■  Allows for future equipment including fixed bioreactor systems and process equipment


New Discovery Laboratory Building: Biology Laboratory
6,500 SF

   ■  JA programmed and planned laboratory for the A/E team
   ■  Designed fixed work area for biologists organized in therapeutic teams
   ■  Designed large open area for mobile carts and equipment
   ■  Provided overhead utilities for complete flexibility in center of the lab
   ■  Dedicated tissue culture and shared equipment rooms at the core and offices on the outside perimeter


Multi-Phase Renovation: Process Chemistry Labs And Support Phase 1A
22,000 SF in this phase

   ■  First phase of the implementation of the Master Plan
   ■  JA provided lab planning, architectural, and interior design services
   ■  Provided medicinal chemistry labs, support spaces, and scientist offices
   ■  Modular laboratory infrastructure approach for HVAC services to align with per phase funding

Multi-Phase Renovation: Process Chemistry Labs And Support Phase 3B
12,000 SF in this phase

   ■  Provided the client with critical scale-up capacity
   ■  Required wide aisles, deep lab benches, and floor mounted fume hoods
   ■  Included glasswash expansion, new receiving area, & maintenance shop
   ■  Incorporated new infrastructure including air, piped, and power systems
   ■  The final phase in a multi-phase project to renovate an existing building for discovery chemistry operations